MOVES, ADDS, CHANGES AND FIELD SERVICES
Move people and equipment without losing track of either.
IQorix coordinates office moves, device deployments and swaps, new-hire setups, and changes across one site or many. We connect remote preparation, scheduled field work, and support handoff so everyone knows what is ready and what is still open.
Plan a move or rolloutWHAT WE CAN COORDINATE
One work order can cover the visit and the handoff.
We provide nationwide remote coordination, field service in NJ, nearby PA, and throughout NY, and travel to other locations by arrangement. Confirm site access, specialist trades, and vendor responsibilities before scheduling.
- Moves and openings
- Survey source and destination, assign workstations, coordinate disconnect and reconnect, confirm network readiness, and validate agreed services after the move.
- Adds and equipment swaps
- Stage approved devices, assign and label assets, coordinate account or application access, confirm setup with the user, and document recovered equipment.
- Changes and field visits
- Schedule reconfigurations, replacements, office changes, or supported break-fix. Coordinate parts, building access, site contacts, and escalation to the right vendor.
HOW A ROLLOUT WORKS
Pilot the checklist before it goes to every site.
Each location gets a work order, acceptance checks, and a contact for issues. The program owner gets a consolidated status and an exception list.
- Prepare and stage
- Verify scope, floor or desk assignments, equipment counts, serials, delivery windows, site readiness, and backup or rollback plans.
- Execute in waves
- Confirm arrival and access, follow the approved install or move checklist, and escalate unexpected work for approval. Track equipment and site sign-off.
- Test and close
- Check agreed connectivity, sign-in, printing, applications, and peripheral function. Record asset moves, recovered items, test results, and exceptions for the service desk.
ILLUSTRATIVE ENGAGEMENT
Refresh workstations at several locations.
A business wants to replace workstations in phases while keeping local staff available for customers.
- Before dispatch
- A site schedule, readiness checklist, staging manifest, and agreed test and escalation steps.
- After each visit
- Work-order notes, installed and removed serials, test results, and photos when approved.
- At closeout
- A reconciled inventory, sign-off status by site, and open items with assigned owners.
FIRST CONVERSATION
Share the sites, equipment, and timing.
Tell us how many locations and devices are involved, which services must work after the visit, and who can approve scope changes on site.
Plan a move or rollout